Please use this identifier to cite or link to this item: http://dspace.usarb.md:8080/jspui/handle/123456789/4760
Title: Modernizarea duzei dispozitivului WORKMAN TP ADE [Articol]
Authors: Vizitov, Alexandr
Balanici, Alexandru, conducător şt.
Keywords: manufacturing
improvement
component
factory
production
modernization
nozzle
prototype
Issue Date: 2019
Publisher: USARB
Citation: Vizitov, Alexandr. Modernizarea duzei dispozitivului WORKMAN TP ADE / A. Vizitov ; conducător şt.: Alexandru Balanici // Interuniversitaria : Materialele Conf. şt. a studenţilor, 23 apr. 2019, ed. a 15-a. – Bălţi, 2019. – Vol. 1. – P. 36-39. – ISBN 978-9975-50-240-5.
Abstract: There is nothing perfect in this world and absolutely everything can be improved. It this article is described the process of modernization of one certain machine component. There appeared some shortcomings in nozzle when using the device. The nozzle got out of commission very quickly and it was necessary each time to buy a new one. It was decided to improve and produce this component at the factory. Two prototypes were manufactured and both were tested. The second one was more suitable and comprised all the requirements. It was installed on the machine and used in the production.
URI: http://dspace.usarb.md:8080/jspui/handle/123456789/4760
Appears in Collections:Articole

Files in This Item:
File Description SizeFormat 
Vizitov_A_modernizare.pdf895,04 kBAdobe PDFThumbnail
View/Open


This item is licensed under a Creative Commons License Creative Commons